- Ensure that the approved and new materials have been used.
- Verify the installations are as per approved shop drawings / Details
- As-built marked on the drawing (Red Mark). If required.
- Ensure the Dynasphere is fixed well.
- Ensure the Upper Termination Kit inside the FRP Support.
- Check the Down Conductor.
- Check the Inline support.
- Check the Lightning Arrester’s support.
- Ensure the Lightning Protection cable is passing through the Lightning Event Counter.
- Check the termination in Equipotential Bus Bar.
- Verify the tagging.
- Check the resistance
- Attach certificate of installation and equipment is in accordance with the requirements shall be given by manufacturer.
Tags
Check List
Important checklist
ReplyDelete