CHECKLIST FOR ELEVATOR INSTALLATION

        

·         Location to install elevator (chase and pit) is free from unwanted materials and debris.                                                                                                                                                                                                   

·         Verticality of elevator chase is confirmed by structural/civil engineer.                                                                                                                                                                                                       

·         Dimension of point of openings of elevator door are in accordance with plans and approved submittals.                                                                                                                                                                                                 

·         Machine room (if separate) is provided with Fire fighting (FM 200 preferable), sufficient number of moist & dust proof lighting fixture, fire detection, and required a/c.                                                                                                                                                                                               

·         Power supply requirement for the elevator is available, sufficient and connected to the emergency system.                                                                                                                                                                                                           

·         Adequate and required cable tray from source of power to elevator control panel and motor is in place.                                                                                                                                                                                                 

·         Mounting pad with approved dimensions is in place for the control panel and motor.                                                                                                                                                                                                                                                                                                                         

·         Physical condition of the car; without scratches, deformations or any form of damage.                                                                                                                                                                                                    

·         Brand, model, make, and capacity are in accordance with the approved drawings and submittal.                                                                                                                                                                                                 

·         Internal control of elevator car is in accordance with the approved submittal and requirement. 
                                                                                                                                                                                                                                                                                   

·         Physical condition of the motor is acceptable. No scratch, deformation, sign of external force impact, etc.                                                                                                                                                                                               

·         The control panel enclosure is without deformation, scratches or any sign of damage.                                                                                                                                                                                                                                                         

·         Free from rust and any sign of damage.                                                                                                                                                                                                

·         Dimension of railings, size of support cables, size and make of the ancillaries (i.e. brackets, bolts, counter-weights, etc.) comply with the approved drawing and material submittals.                                                                                                                                                                                                                                                                                                        

·         Number, size and type of insulation of the cables connecting from motor to control panel, control panel to power source are in accordance with the design and have undergone / passed the insulation and continuity test.                                                                                                                                                                                                             

·         Motor and control panel are securely fastened at mounting pad.                                                                                                                                                                                               

·         Car supports and wench and appropriately mounted and supported accordingly with the approved drawings and manufacturer's recommendation.                                                                                                                                                                                                          

·         Control panel with sufficient number of provisions (dry contact) for fire alarm, bms, home automation, etc.                                                                                                                                                                                                          

·         Power and control cables are properly supported to prevent mechanical strain on the termination point.                                                                                                                                                                                                

·         Power and control cables are properly fashioned and tightly terminated in termination points.                                                                                                                                                 

·         Check for the overload alarm with load test                                                                                                                                                                                                        

·         Check for emergency operation at fire conditions, power failure etc. 

·         Check the intercom functions in/out                                                                                                      


 


·        

Post a Comment