- Verify that the approved and new materials have been used.
- Verify the installations are as per approved shop drawings / Details
- As-built marked on the drawing (Red Mark). If required.
- Ensure the Cu.Bar is installed in the correct location.
- Check the equipotential bar size as per approved shop drawing.
- Check the size of the earth cable.
- Ensure the Cable termination between equipment and the copper bar.
- Ensure the Cu. Bar terminated with equipotential bar.