CHECKLIST FOR SMB TERMINATION

  1.  Materials used are all approved?                                                                                                                                                                                                             
  2. Shop drawings have been approved?                                                                                                                                                                                                     
  3. Installation carried out as per approved details and shop drawings?                                                                                                                                                                                                        
  4. As-built marked on the drawings (red mark). If required?                                                                                                                                                                                              
  5. Incoming & Out-going cables are pulled?                                                                                                                                                                                                              
  6. Separation form for panels has been checked?                                                                                                                                                                   

                                    
  7. Fixing of glands for incoming & out-going power cables is properly done?                                                                                                                                                                                                              
  8. Gland earthing is done properly?                                                                                                                                                                                                             
  9. Incoming & Out-going cable lug crimping has been done?                                                                                                                                                                                                            
  10. Incoming & Out-going cable termination has been done properly?                                                                                                                                                                                                           
  11. Neutral & earth cables are connected to relevant links?                                                                                                                                                                                                 
  12. Cables are tagged as per approved Single Line Drawing?                                                                                                                                                                                                
  13. As-built schematic (SLD) is enclosed?                                                                                                                                                                                                  

       