BASELINE PROJECT SCHEDULE - TEMPLATE SAMPLE

 

                             Project : MEP Modification works

                                 Main Contractor: 

                                 MEP Contractor: 

BASELINE PROJECT SCHEDULE

Sl.no:

Item Description

Quantity

Submittal Estimated Date

Start date

End date

Remarks

A

Shop Drawing Preparation

 

 

 

 

 

A.1

Lighting Layout for Ground Floor

1 No

01-01-20

 

 

 

A.2

Lighting Layout for First Floor

1 No

01-01-20

 

 

 

A.3

Lighting Layout for Pent House Floor

1 No

01-06-20

 

 

 

A.4

Small Power Layout for Ground Floor

1 No

01-01-20

 

 

 

A.5

Small Power Layout for First Floor

1 No

01-01-20

 

 

 

A.6

Small Power Layout for Pent House Floor

1 No

01-06-20

 

 

 

A.7

DB Schedule for Ground floor

1 No

01-01-20

 

 

 

A.8

DB Schedule for First and Penthouse floor

1 No

01-06-20

 

 

 

A.9

ELV Layout for Ground Floor

1 No

 

 

 

Subject to ELV Design Drawing Details

A.10

ELV Layout for First Floor

1 No

 

 

 

A.11

ELV Layout for Pent House Floor

1 No

 

 

 

 

 

 

 

 

 

 

B

Electrical Material Submittal

9 Nos.

01-06-20

 

 

 

 

 

 

 

 

 

 

C

Electrical Material Delivery - Local

1 Lot

01-06-20

 

 

 

 

 

 

 

 

 

 

D

Electrical Material  Delivery - Imported

1 Lot

24/1/2020

 

 

Except DB & SMB , Other Material shall be delivered before this date

 

 

 

 

 

 

 

E

Mobilization of Manpower at Site

 

 

12-04-19

till to finish

 

 

 

 

 

 

 

F

Demolition Works

 

 

 

 

 

F.1

Demolition Works at Ground Floor

1 Item

 

12-07-19

12-10-19

 

F.2

Demolition Works at First Floor

1 Item

 

14/12/2019

16/12/2019

 

F.3

Demolition Works at Pent house Floor

1 Item

 

24/12/2019

29/12/2019

 

 

 

 

 

 

 

 

G

ELECTRICAL WORKS -1st FIX GROUND FLOOR

 

 

 

 

Subject to ceiling Access & wall Clearance

G.1

Electrical-1st Fix. _ Marking /Chipping

1 No.

 

12-07-19

21/12/2019

 

G.2

Electrical-1st Fix. _ PVC Conduiting-Lighting

1 Lot.

 

21/12/2019

26/12/2019

 

G.3

Electrical-1st Fix. _ PVC Conduiting-Small Power

1 Lot.

 

26/12/2019

29/12/2019

 

G.4

Electrical-1st Fix. _ PVC Conduiting- For DB

1 Lot.

 

30/12/2019

30/12/2019

 

 

 

 

 

 

 

 

H

FIRST FLOOR

 

 

 

 

Subject to ceiling Access & wall Clearance

H.1

Electrical-1st Fix. _ Marking /Chipping

1 No.

 

12-07-19

21/12/2019

 

H.2

Electrical-1st Fix. _ PVC Conduiting-Lighting

1 lot.

 

21/12/2019

01-02-20

 

H.3

Electrical-1st Fix. _ PVC Conduiting-Small Power

1 Lot.

 

01-04-20

01-07-20

 

 

 

 

 

 

 

 

I

PENTHOUSE

 

 

 

 

Subject to ceiling Access & wall Clearance

I.1

Electrical-1st Fix. _ Marking /Chipping

1 No.

 

01-05-20

01-06-20

 

I.2

Electrical-1st Fix. _ PVC Conduiting-Lighting

1 lot.

 

01-07-20

01-08-20

 

I.3

Electrical-1st Fix. _ PVC Conduiting-Small Power

1 Lot.

 

01-09-20

13/1/2020

 

 

 

 

 

 

 

 

J

ELECTRICAL WORKS -2nd FIX GROUND FLOOR

 

 

 

 

 

J.1

Electrical-2nd Fix._ PVC wiring for lighting

1 lot.

 

14/01/2020

15/01/2020

 

J.2

Electrical-2nd Fix._ PVC wiring for small power

1 lot.

 

16/01/2020

19/01/2020

 

J.3

Electrical-2nd Fix._ DB Installation

1 lot.

 

24/01/2020

24/01/2020

 

 

 

 

 

 

 

 

K

ELECTRICAL WORKS -2nd FIX FIRST FLOOR

 

 

 

 

 

K.1

Electrical-2nd Fix._ PVC wiring for lighting

1 lot.

 

20/01/2020

21/01/2020

 

K.2

Electrical-2nd Fix._ PVC wiring for small power

1 lot.

 

22/01/2020

22/01/2020

 

K.3

Electrical-2nd Fix._ DB Installation

1 lot.

 

23/01/2020

23/01/2020

 

 

 

 

 

 

 

 

L

ELECTRICAL WORKS -2nd FIX PENTHOUSE FLOOR

 

 

 

 

 

L.1

Electrical-2nd Fix._ PVC wiring for lighting

1 Lot.

 

23/01/2020

23/01/2020

 

L.2

Electrical-2nd Fix._ PVC wiring for small power

1 Lot.

 

24/01/2020

25/01/2020

 

L.3

Electrical-2nd Fix._ DB Installation

1 Lot.

 

26/01/2020

26/01/2020

 

 

 

 

 

 

 

 

M

ELECTRICAL WORKS - FINAL FIX GROUND FLOOR

 

 

 

 

Subject to ceiling Access & wall Clearance

M.1

Electrical-2nd Fix._ Light Fixture Installation

1 lot.

 

28/01/2020

30/01/2020

 

M.2

Electrical-2nd Fix._  socket outlet Installation

1 lot.

 

02-01-20

02-02-20

 

M.3

Electrical-2nd Fix._  DB Dressing & MDB Installation

1 lot.

 

02-03-20

02-05-20

 

 

 

 

 

 

 

 

N

ELECTRICAL WORKS - FINAL FIX FIRST FLOOR

 

 

 

 

Subject to ceiling Access & wall Clearance

N.1

Electrical-2nd Fix._ Light Fixture Installation

1 Lot.

 

02-06-20

02-09-20

 

N.2

Electrical-2nd Fix._  socket outlet Installation

1 Lot.

 

02-10-20

02-10-20

 

N.3

Electrical-2nd Fix._  DB Dressing

1 Lot.

 

02-11-20

02-12-20

 

 

 

 

 

 

 

 

O

ELECTRICAL WORKS - FINAL FIX PENTHOUSE

 

 

 

 

Subject to ceiling Access & wall Clearance

O.1

Electrical-Final Fix._ Light Fixture Installation

1 Lot.

 

13/2/2020

13/2/2020

 

O.2

Electrical-Final Fix._  Socket & Isolators Installation

1 Lot.

 

15/02/2020

15/02/2020

 

O.3

Electrical-Final Fix._  DB Dressing

1 Lot.

 

16/02/2020

16/02/2020

 

 

 

 

 

 

 

 

P

ELECTRICAL WORKS - TESTING & COMMISSIONING

 

 

 

 

Subject to ceiling Access & wall Clearance

P.1

Electrical _ Light Fixture Installation

1 Lot.

 

17/2/2020

17/2/2020

 

P.2

Electrical _ Socket & Isolators Installation

1 Lot.

 

17/2/2020

17/2/2020

 

P.3

Electrical _ Panels and DBs Breakers

1 Lot.

 

17/2/2020

17/2/2020

 

 