List of Electrical
Activities which are executed generally at site on Electrical/ELV projects |
|||||||
Sl.No: |
Activity |
Installation covered |
Unit |
Remark |
No.of hours |
No.of person |
Manhours |
|
|
|
|
|
|
|
|
1 |
PVC Conduiting (20,25,32mm
dia) / point |
Lighting, LCP, CBS, Small
power, Equipment power |
Meter |
Rate differs based on the
access availability |
0.5 |
3 |
2 |
2 |
PVC Conduiting (> 38 mm
dia) / point |
Lighting, LCP, CBS, Small
power, Equipment power |
Meter |
0.5 |
3 |
2 |
|
3 |
G.I Conduiting (20,25,32mm
dia) / point |
Lighting, LCP, CBS, Small
power, Equipment power |
Meter |
1 |
4 |
4 |
|
4 |
uPVC ducting for sleeves |
Power distribution for
Small power, Equipment power & ELV services |
Meter |
0.5 |
2 |
1 |
|
5 |
Cable tray (<225 mm
wide) |
Power distribution for
Small power, Equipment power & ELV services |
Meter |
Rate differs based on the
fitting available (i.e. Ready made or Custom fabrication) |
1 |
4 |
4 |
6 |
Cable tray (>225 &
<450 mm wide) |
Power distribution for
Small power, Equipment power & ELV services |
Meter |
1 |
4 |
4 |
|
7 |
Cable tray (450 & 600
mm wide) |
Power distribution for
Small power, Equipment power & ELV services |
Meter |
1 |
4 |
4 |
|
8 |
Cable tray (>600 &
<800 mm wide) |
Power distribution for
Small power, Equipment power & ELV services |
Meter |
1.5 |
4 |
6 |
|
9 |
Cable tray (>800 mm
wide) |
Power distribution for
Small power, Equipment power & ELV services |
Meter |
1.5 |
4 |
6 |
|
10 |
Cable trunking (<225 mm
wide) |
Power distribution for
Small power, Equipment power & ELV services |
Meter |
2 |
4 |
8 |
|
11 |
Cable trunking (>225
& <450 mm wide) |
Power distribution for
Small power, Equipment power & ELV services |
Meter |
1 |
4 |
4 |
|
12 |
Cable ladder (>450 &
<600 mm wide) |
Power distribution for
Small power, Equipment power & ELV services |
No. |
|
1 |
4 |
4 |
13 |
Cable ladder (>600 &
<900 mm wide) |
Power distribution for
Small power, Equipment power & ELV services |
No. |
|
1.5 |
4 |
6 |
14 |
DB Installation (4 to 8
way) |
Installation & Termination |
No. |
|
8 |
4 |
32 |
15 |
DB Installation (10 to 14
way) |
Installation &
Termination |
No. |
|
14 |
4 |
56 |
16 |
DB Installation (>16
way) |
Installation &
Termination |
No. |
|
16 |
4 |
64 |
17 |
SMDB Installation (4 to 8
way) |
Installation, Glanding
& Termination |
No. |
|
19 |
4 |
76 |
18 |
SMDB Installation (10 to 14
way) |
Installation, Glanding
& Termination |
No. |
|
24 |
4 |
96 |
19 |
MSB Installation (4 to 8
way) |
Installation, Glanding
& Termination |
No. |
|
22 |
5 |
## |
20 |
MCC Panel Installation |
Installation, Glanding
& Termination |
No. |
|
16 |
4 |
64 |
21 |
LV panel installation |
Installation, Glanding
& Termination |
No. |
|
48 |
6 |
## |
22 |
Transformer Installation |
Installation, Glanding
& Termination |
No. |
|
80 |
6 |
## |
23 |
UPS -1 PH & 3 PH (<
10kVA) |
Installation, Glanding
& Termination |
No. |
|
10 |
3 |
30 |
24 |
UPS -1 PH & 3 PH
(>10kVA & < 20kVA) |
Installation, Glanding
& Termination |
No. |
|
10 |
4 |
40 |
25 |
UPS -1 PH & 3 PH
(>20kVA & < 40kVA) |
Installation, Glanding
& Termination |
No. |
|
14 |
5 |
70 |
26 |
UPS -1 PH & 3 PH
(>40kVA & < 60kVA) |
Installation, Glanding
& Termination |
No. |
|
24 |
5 |
## |
27 |
UPS -1 PH & 3 PH
(>60kVA & higher) |
Installation, Glanding
& Termination |
No. |
|
24 |
5 |
## |
28 |
Lighting Control panel |
Installation, Glanding
& Termination |
No. |
|
8 |
4 |
32 |
29 |
Central Battery system
panels |
Installation, Glanding
& Termination |
No. |
|
8 |
4 |
32 |
30 |
Main CBS panel with battery
rack |
Installation, Glanding
& Termination |
No. |
|
32 |
5 |
## |
31 |
Armoured cables - 3C/4C x
2.5 - 6 sq.mm |
Cable pulling, Glanding
& Termination |
Meter |
|
1 |
3 |
3 |
32 |
Armoured cables - 3C/4C x
10 - 16 sq.mm |
Cable pulling, Glanding
& Termination |
Meter |
|
1 |
4 |
4 |
33 |
Armoured cables - 3C/4C x
25 - 35 sq.mm |
Cable pulling, Glanding
& Termination |
Meter |
|
1 |
5 |
5 |
34 |
Armoured cables - 3C/4C x
50 - 95 sq.mm |
Cable pulling, Glanding
& Termination |
Meter |
|
1.5 |
6 |
9 |
35 |
Armoured cables - 3C/4C x
120 - 150 sq.mm |
Cable pulling, Glanding
& Termination |
Meter |
|
2 |
6 |
12 |
36 |
Armoured cables - 3C/4C x
185 - 240 sq.mm |
Cable pulling, Glanding
& Termination |
Meter |
|
2.5 |
6 |
15 |
37 |
Armoured cables - 3C/4C x
300 - 400 sq.mm |
Cable pulling, Glanding
& Termination |
Meter |
|
3 |
6 |
18 |
38 |
Armoured cables - 1C x 800
sq.mm |
Cable pulling, Glanding
& Termination |
Meter |
|
5 |
8 |
40 |
39 |
Earth cables - 1C x 2.5 - 6
sq.mm |
Cable pulling, Glanding
& Termination |
Meter |
|
1 |
3 |
3 |
40 |
Earth cables - 1C x 10 - 16
sq.mm |
Cable pulling, Glanding
& Termination |
Meter |
|
1 |
4 |
4 |
41 |
Earth cables - 1C x 25 - 35
sq.mm |
Cable pulling, Glanding
& Termination |
Meter |
|
1 |
4 |
4 |
42 |
Earth cables - 1C x 50 - 95
sq.mm |
Cable pulling, Glanding
& Termination |
Meter |
|
1.5 |
4 |
6 |
43 |
Earth cables - 1C x 120 -
150 sq.mm |
Cable pulling, Glanding
& Termination |
Meter |
|
1.5 |
5 |
8 |
44 |
Earth cables - 1C x 185 -
240 sq.mm |
Cable pulling, Glanding
& Termination |
Meter |
|
2 |
5 |
10 |
45 |
Earth cables - 1C x 300 -
400 sq.mm |
Cable pulling, Glanding
& Termination |
Meter |
|
2 |
6 |
12 |
46 |
Earth cables - 1C x 400
sq.mm |
Cable pulling, Glanding
& Termination |
Meter |
|
2 |
6 |
12 |
47 |
Single core PVC wiring for
lighting point |
PVC wiring |
Meter |
|
1 |
4 |
4 |
48 |
FP200 wiring for emergency
lighting point |
FP200 wiring |
Meter |
|
1 |
4 |
4 |
49 |
Ceiling rose installation |
Installation &
Termination |
No. |
|
1 |
2 |
2 |
50 |
Dismantle - Spot light
& Down light |
Dismantling &
Relocation with same material |
No. |
|
1.5 |
2 |
3 |
51 |
Dismantle - 60x 60mm |
Dismantling &
Relocation with same material |
No. |
|
1.5 |
2 |
3 |
52 |
Dismantle - LED cove,
linear strip |
Dismantling &
Relocation with same material |
Meter |
|
1.5 |
2 |
3 |
53 |
Dismantle - Pendant |
Dismantling &
Relocation with same material |
No. |
|
2 |
2 |
4 |
54 |
Dismantle - Pole mounted |
Dismantling &
Relocation with same material |
No. |
|
2 |
2 |
4 |
55 |
Dismantle - Chandlier |
Dismantling &
Relocation with same material |
No. |
|
6 |
4 |
24 |
56 |
Dismantle - Switches,
Sockets & Outlets |
Dismantling &
Relocation with same material |
No. |
|
2 |
2 |
4 |
57 |
Dismantle - Isolators |
Dismantling &
Relocation with same material |
No. |
|
4 |
2 |
8 |
58 |
Dismantle - Floor box |
Dismantling & Relocation
with same material |
No. |
|
2 |
2 |
4 |
59 |
Dismantle - Floor trunking |
Dismantling &
Relocation with same material |
Meter |
|
2 |
2 |
4 |
60 |
Light fixtures - Spot |
Installation &
Termination with driver |
No. |
|
1 |
2 |
2 |
61 |
Light fixtures - Down |
Installation &
Termination with driver |
No. |
|
1 |
2 |
2 |
62 |
Light fixtures - 60 x 60mm |
Installation &
Termination with driver |
No. |
|
1 |
2 |
2 |
63 |
Light fixtures - LED Cove |
Installation &
Termination with driver |
Meter |
|
1 |
2 |
2 |
64 |
Light fixtures - Linear
recessed strip |
Installation &
Termination with driver |
Meter |
|
1 |
2 |
2 |
65 |
Light fixtures - Linear
surface mounting |
Installation &
Termination with driver |
No. |
|
1 |
2 |
2 |
66 |
Light fixtures - Pendant
light |
Installation &
Termination with driver |
No. |
|
1 |
2 |
2 |
67 |
Light fixtures - Wall
Mounted |
Installation &
Termination with driver |
No. |
|
1 |
2 |
2 |
68 |
Light fixtures - Pole
Mounted |
Installation &
Termination with driver |
No. |
|
1 |
2 |
2 |
69 |
Light fixtures - Chandlier |
Installation & Termination
with driver |
No. |
|
4 |
4 |
16 |
70 |
Light fixtures - Special
Custom made |
Installation &
Termination with driver |
No. |
|
2 |
2 |
4 |
71 |
Light fixtures - EXIT (Wall
& ceiling mounted) |
Installation & Termination
with driver/modules & batteries |
No. |
|
1 |
2 |
2 |
72 |
Light fixtures - Emergency
(Wall & ceiling mounted) |
Installation &
Termination with driver/modules & batteries |
No. |
|
1 |
2 |
2 |
73 |
Presence Sensor |
Installation &
Termination |
No. |
|
0.5 |
2 |
1 |
74 |
Day light Sensor |
Installation &
Termination |
No. |
|
0.5 |
2 |
1 |
75 |
Switches - 1G, 2G, 3G &
Multigang normal |
Installation &
Termination |
No. |
|
1.5 |
2 |
3 |
76 |
Switches - 1G, 2G, 3G &
Multigang Grid |
Installation &
Termination |
No. |
|
1.5 |
2 |
3 |
77 |
Switches - 1G, 2G, 3G &
Multigang Dimmer |
Installation &
Termination |
No. |
|
1.5 |
2 |
3 |
78 |
Switches - 1G, 2G, 3G &
Multigang Push button |
Installation &
Termination |
No. |
|
1.5 |
2 |
3 |
79 |
Sockets - 1G, 2G normal |
Installation &
Termination |
No. |
|
1.5 |
2 |
3 |
80 |
Sockets - 1G, 2G Weather
Proof |
Installation &
Termination |
No. |
|
1.5 |
2 |
3 |
81 |
DP, Spur units, Flex outlet
etc. |
Installation &
Termination |
No. |
|
1.5 |
2 |
3 |
82 |
Floor Box |
Installation &
Termination |
No. |
|
2 |
2 |
4 |
83 |
Industrial sockets - 1
& 3 Phase |
Installation & Termination |
No. |
|
1 |
2 |
2 |
84 |
Isolators - 1 & 3 Phase
(On wall / slab) |
Installation, Glanding
& Termination |
No. |
|
2 |
2 |
4 |
85 |
Isolators - 1 & 3 Phase
(On pedestrail) |
Installation, Glanding
& Termination |
No. |
|
3 |
2 |
6 |
86 |
Dismantle - FACP, MIMIC,
Zone Chart, Evac. Panel |
Dismantling &
Relocation with same material |
No. |
|
10 |
3 |
30 |
87 |
Dismantle - SD, HD, MSD,
LED indicator |
Dismantling &
Relocation with same material |
No. |
|
2 |
2 |
4 |
88 |
Dismantle - Pull station,
Sounder, Modules |
Dismantling &
Relocation with same material |
No. |
|
2 |
2 |
4 |
89 |
Fire Alarm Panel
Installation |
Installation, Glanding
& Termination |
No. |
|
8 |
3 |
24 |
90 |
Evacuation control panel
Installation |
Installation, Glanding
& Termination |
No. |
|
8 |
3 |
24 |
91 |
MIMIC panel installation |
Installation, Glanding
& Termination |
No. |
|
8 |
3 |
24 |
92 |
Zone Chart installation |
Installation, Glanding
& Termination |
No. |
|
8 |
3 |
24 |
93 |
Smoke /Heat / Multi sensor
detector |
Installation, Glanding
& Termination & Addressing |
No. |
|
1 |
2 |
2 |
94 |
LED indicator |
Installation, Glanding
& Termination & Addressing |
No. |
|
0.5 |
2 |
1 |
95 |
Pull station |
Installation, Glanding
& Termination & Addressing |
No. |
|
1 |
2 |
2 |
96 |
Sounder |
Installation, Glanding
& Termination & Addressing |
No. |
|
1 |
2 |
2 |
97 |
Module - Monitor/Control
& I/O |
Installation, Glanding
& Termination & Addressing |
No. |
|
1 |
2 |
2 |
98 |
FP200 2C x 1.5 Sq.mm for FA
devices |
Cable pulling only |
No. |
|
1 |
2 |
2 |
99 |
FP200 2C x 2.5 Sq.mm for
Sounder |
Cable pulling only |
No. |
|
1 |
2 |
2 |
100 |
Containment for FA devices
with 25mm dia conduit |
Conduiting only |
No. |
|
1 |
4 |
4 |
101 |
Dismantle - IT- IDF rack
wall mounted |
Dismantling &
Relocation with same material |
No. |
|
10 |
3 |
30 |
102 |
Dismantle - IT- IDF rack
floor mounted |
Dismantling &
Relocation with same material |
No. |
|
10 |
3 |
30 |
103 |
Dismantle - IT- MDF rack
floor mounted |
Dismantling &
Relocation with same material |
No. |
|
10 |
5 |
50 |
104 |
Dismantle - Data/Tel.outlet |
Dismantling & Relocation
with same material |
No. |
|
2 |
2 |
4 |
105 |
Dismantle - WAP |
Dismantling &
Relocation with same material |
No. |
|
2 |
2 |
4 |
106 |
MDF rack for IT |
Panel / Enclosure
Installation only |
No. |
|
6 |
5 |
30 |
107 |
IDF rack for IT |
Panel / Enclosure
Installation only |
No. |
|
4 |
3 |
12 |
108 |
FOC cabling for IDF &
MDF |
Cable pulling only |
Meter |
|
1 |
3 |
3 |
109 |
Cat 6A cabling for data
& tel. point |
Cable pulling only |
Meter |
|
1 |
3 |
3 |
110 |
Containment for IT devices
with 25mm dia conduit |
Conduiting only |
Meter |
|
0.5 |
3 |
2 |
111 |
Data / Tel. / WAP outlet
installation |
Outlet fixing, termination
& testing by TPI System specialist |
No. |
|
1 |
2 |
2 |
112 |
Dismantle - CCTV- IDF rack
wall mounted |
Dismantling &
Relocation with same material |
No. |
|
10 |
3 |
30 |
113 |
Dismantle - CCTV- IDF rack
floor mounted |
Dismantling &
Relocation with same material |
No. |
|
10 |
3 |
30 |
114 |
Dismantle - CCTV- MDF rack
floor mounted |
Dismantling &
Relocation with same material |
No. |
|
10 |
5 |
50 |
115 |
Dismantle - CCTV outlet |
Dismantling &
Relocation with same material |
No. |
|
2 |
2 |
4 |
116 |
Dismantle - CCTV Cameras |
Dismantling &
Relocation with same material |
No. |
|
2 |
2 |
4 |
117 |
MDF rack for CCTV |
Panel / Enclosure
Installation only |
No. |
|
8 |
6 |
48 |
118 |
IDF rack for CCTV |
Panel / Enclosure
Installation only |
No. |
|
8 |
4 |
32 |
119 |
FOC cabling for IDF &
MDF |
Cable pulling only |
Meter |
|
1 |
3 |
3 |
120 |
Cat 6A cabling for CCTV
point |
Cable pulling only |
Meter |
|
1 |
3 |
3 |
121 |
Containment for CCTV
devices with 25mm dia conduit |
Conduiting only |
Meter |
|
0.5 |
3 |
2 |
122 |
CCTV outlet installation |
Outlet fixing, termination
& testing by TPI System specialist |
No. |
|
1 |
2 |
2 |
123 |
CCTV camera installation |
Installation, termination
& testing by TPI System specialist |
No. |
|
1.5 |
2 |
3 |
124 |
Dismantle - ACS- IDF rack
wall mounted |
Dismantling &
Relocation with same material |
No. |
|
10 |
3 |
30 |
125 |
Dismantle - ACS- IDF rack
floor mounted |
Dismantling &
Relocation with same material |
No. |
|
10 |
3 |
30 |
126 |
Dismantle - ACS- MDF rack
floor mounted |
Dismantling &
Relocation with same material |
No. |
|
10 |
5 |
50 |
127 |
Dismantle - ACS outlet |
Dismantling &
Relocation with same material |
No. |
|
2 |
2 |
4 |
128 |
Dismantle - ACS Field Devices |
Dismantling &
Relocation with same material |
No. |
|
2 |
2 |
4 |
129 |
MDF rack for ACS |
Panel / Enclosure
Installation only |
No. |
|
8 |
6 |
48 |
130 |
IDF rack for ACS |
Panel / Enclosure
Installation only |
No. |
|
8 |
4 |
32 |
131 |
FOC cabling for IDF &
MDF |
Cable pulling only |
Meter |
|
1 |
3 |
3 |
132 |
Cat 6A cabling for ACS
point |
Cable pulling only |
Meter |
|
1 |
3 |
3 |
133 |
Containment for ACS devices
with 25mm dia conduit |
Conduiting only |
Meter |
|
0.5 |
3 |
2 |
134 |
ACS Field Device
installation |
Outlet fixing, termination
& testing by TPI System specialist |
No. |
|
0.5 |
2 |
1 |
135 |
Dismantle - PA rack wall
mounted |
Dismantling &
Relocation with same material |
No. |
|
10 |
3 |
30 |
136 |
Dismantle - PA rack floor
mounted |
Dismantling &
Relocation with same material |
No. |
|
10 |
3 |
30 |
137 |
Dismantle - PA speakers |
Dismantling &
Relocation with same material |
No. |
|
2 |
2 |
4 |
138 |
PA rack wall mounted |
Panel / Enclosure
Installation only |
No. |
|
8 |
4 |
32 |
139 |
PA rack floor mounted |
Panel / Enclosure
Installation only |
No. |
|
8 |
4 |
32 |
140 |
PA speakers point |
Cable pulling only |
Meter |
|
1 |
3 |
3 |
141 |
Containment for PA devices
with 25mm dia conduit |
Conduiting only |
Meter |
|
1 |
4 |
4 |
142 |
PA speakers device
installation |
Installation, termination
by NEC & testing by TPI System specialist |
No. |
|
1 |
2 |
2 |
143 |
Dismantle - DAS rack wall
mounted |
Dismantling &
Relocation with same material |
No. |
|
10 |
4 |
40 |
144 |
Dismantle - DAS field
Devices |
Dismantling &
Relocation with same material |
No. |
|
2 |
2 |
4 |
145 |
DAS rack wall mounted |
Panel / Enclosure
Installation only |
No. |
|
8 |
3 |
24 |
146 |
Containment for DAS devices
with 25mm dia conduit |
Conduiting only |
No. |
|
0.5 |
3 |
2 |
147 |
DAS Field Devices point
wiring |
Cable pulling only |
No. |
|
1 |
3 |
3 |
148 |
DAS Field Devices |
Installation, termination
by Contractor & testing by TPI System specialist |
No. |
|
1.5 |
2 |
3 |
149 |
DDC Panels |
Installation, termination
by Contractor & testing by TPI System specialist |
No. |
|
24 |
3 |
72 |
150 |
DDC works station |
Installation, termination
by Contractor & testing by TPI System specialist |
No. |
|
8 |
3 |
24 |
151 |
BMS field sensors |
Installation, termination
by Contractor & testing by TPI System specialist |
No. |
|
2 |
2 |
4 |