- Check the delivery note is attached along with the inspection request
- Check if the DDC Panel schematic diagram duly signed and stamped by the manufacturer as per the approved material submittal has been attached
- Visual Inspection for any physical damage, uninstalled accessories, (Ensure Auxiliary power point is available in each panel) corrosion, stand/supports depending upon the panel location or any other defect
- Copies of Factory Test reports/certificates should be submitted by the manufacturer/system specialist at the time of inspection.
- Confirm the Quantity of DDC Panels is as per the project requirement.
- Check the Material storage is in the correct and suitable dry place.
Tags
Check List